Construction of Kazakh-Chinese investment projects will be carried out in accordance with the legislation of Kazakhstan

During the period of Kazakhstan’s independence, 361.8 billion US dollars of foreign investments from more than 120 countries have been attracted. The People’s Republic of China accounts for about 6%.

In accordance with the Intergovernmental Framework Agreement between the Republic of Kazakhstan and the PRC on strengthening cooperation in the field of industrialization and investment, signed in 2015 at a high political level, 52 joint Kazakh-Chinese projects worth $ 21.1 billion have being implemented in Kazakhstan in such sectors as: metallurgy, oil and gas processing, chemical industry, mechanical engineering, electric power industry, transport, construction materials, healthcare and agriculture.

It should be noted that from 2015 to July 2022, 20 projects worth $ 4453 million have been launched, 15 projects totaling $ 5326 million are under implementation, and 17 projects are under consideration.

As a result of the implementation of the Kazakhstan-China program of industrial and investment cooperation, it is expected to create a number of high-tech competitive enterprises focused on exports to foreign markets. About 22 thousand new jobs are expected to be created, with the share of Kazakhstani workers amounting to more than 90%.

The final products of future production facilities will be passenger cars, oil and gas equipment, steel pipes, special alloys, primary aluminum, soda ash, polypropylene, rapeseed oil and meat products.

Additionally, there will be projects in the power, construction, light industry, infrastructure and healthcare sectors. 

All projects implemented in different regions of the country, using modern technologies, their construction is carried out in accordance with the requirements of the legislation of the Republic of Kazakhstan, including in terms of obtaining permits in the field of product safety, environmental and other standards. All projects without exception must receive a positive conclusion of the state expertise, and only then will the construction of production facilities be authorized.

List of Kazakh-Chinese industrial and investment projects implemented under the Intergovernmental Agreement

 

 


Project name

 

 


Industry

 

 


Region

 

 


Project cost, $ mln.

 

 


Start of construction/land works

 

 

Commissioning

 

Permanent jobs

COMPLETED (20 projects)

1.     

Modernization of polypropylene powder production unit

Petrochemistry

Pavlodar region

12

2015

2015

953

2.     

Production of passenger cars

Machine building

Kostanay region

22

 

 

2015

2017

290

3.     

Rapeseed oil production

AGRO-INDUSTRIAL COMPLEX

North-Kazakhstan region

19

2016

2016

64

4.     

Dry port on the territory of FEZ “Khorgos – Eastern Gate”

Infrastructure

Almaty region

76

2014

2016

176

5.     

Processing of camel and mare milk powder production

AGRO-INDUSTRIAL COMPLEX

Turkestan region

22

2016

2018

120

6.     

Organization of production of PET waste recycling and production of staple fiber (syntepon)

Chemical

Turkestan region

20

2016

2018

98

7.     

Oil refinery (stages I and II of reconstruction)

Oil refining

Shymkent city

2 100

2017
(2-stage)

2018
(2-stage)

2 296

8.     

Development of a multi-disciplinary automobile assembly cluster

Machine building

Kostanay region

1 100

2017

2018

500

9.     

Realization of the project on construction of a glass plant

Construction

Kyzylorda region

200

2015

2018

226

10.

MFCA Exchange

finance

г. Nur-Sultan

13

2018

2018

Not foreseen

11.

Cement production

Construction

Kyzylorda region

177

2016

2018

260

12.

Construction of a 30 MW solar power plant

Electric power industry

EAST-KAZAKHSTAN REGION

29

2018

2019

15

13.

Construction of a 100 MW solar power plant

Electric power industry

Almaty region

107

 

 

2018

2019

32

14.

Organization of tractor production

Machine building

Kostanay region

10

2019

2019

100

15.

Construction of a 50 MW solar power plant.

Electric power industry

Almaty region

42

2019

2020

15

16.

Production of components for the energy industry

Nuclear energy

EAST-KAZAKHSTAN REGION

154

2018

2020

129

17.

Construction of a 100 MW wind power plant

Electric power industry

Zhambyl region

150

2019

2021

30

18.

Construction of HPPs

Electric power industry

EAST-KAZAKHSTAN REGION

50

2016

2021

20

19.

Construction of a 50 MW wind power plant.

Electric power industry

Kostanay region

50

2020

2021

15

20.

Production of large diameter welded steel pipes

Metallurgy

Almaty

100

2016

2022

300

ONGOING (15 projects)

21.

Polypropylene production

Chemical

Atyrau region

2 630

 

 

2017

2022

550

22.

Construction of a 60 MW wind power plant

Electric power industry

Almaty region

102.6

2018

2022

14

23.

Construction of Technopark on the territory of FEZ “Khorgos-Eastern Gate”

Infrastructure

Almaty region

205

2018

2025

380

24.

Plant for the production of industrial explosives

Chemical

Karaganda region

25

2019

2022

120

25.

Construction of a formation water desalination plant

Water treatment

Mangistau region

60

2019

2022

40

26.

Construction of an oil extraction plant

AIC

Akmola region

86

2021

2023

194

27.

Processing and production of natural stone products (2-stage)

Stone processing

Zhambyl region

20

2019

2022

100

28.

New transportation system for the city of Nur-Sultan

Infrastructure

г. Nur-Sultan

1 500

2016

2023

500

29.

Construction of a lead and zinc slag waste recycling plant

Metallurgy

Zhambyl region

20

2020

2022

250

30.

Development of tungsten ore deposit

MMC

Almaty region

260

2020

2023

1000

31.

Construction of a 100 MW wind power plant

Electric power industry

EAST-KAZAKHSTAN REGION

100

2021

2022

15

32.

Construction of a 50 MW wind power plant

Electric power industry

Almaty region

50

2021

2022

15

33.

Manufacture of ceramic products

Construction

Almaty region

18.5

2019

2023

550

34.

Creation of a line for the production of veterinary drugs

AICAGRO-INDUSTRIAL COMPLEX

Zhambyl region

23

2022

2022

49

35.

Construction of 3 wind power plants with total capacity of 156 MW

Electric power industry

Akmola region

226

2022

2023

45

CONSIDERED (17 projects)

36.

Production of mobile drilling rigs

Machine building

Aktobe region

13

2021

2022

150

37.

Manufacture of cable products

Machine building

Karaganda region

18

2022

2022

258

38.

Development and processing of ferro-titanium ores

MMC

Pavlodar oblast/ Zhambyl region

2 300

 

 

2022

2025

3 000

39.

Construction of a chemical complex

Chemical

Turkestan region

315

2021

2023

500

40.

Construction of a multidisciplinary university hospital

Health care

Shymkent city

189

2021

2023

1 300

41.

Production of soda ash

Chemical

Kyzylorda region

275

2022

2024

699

42.

Construction of a plant for production of electrolytic manganese

MMC

Karaganda region

45

2022

2024

250

43.

Plant for harmless treatment of hazardous oily wastes

Petrochemistry

Mangistau region

97

2022

2023

209

44.

Expansion of gas turbine power plant capacity

Power Industry

WKR

354

2022

2024(1 stage) 2025 (2 stage)

150

45.

Copper deposit development

MMC

Almaty region

1 500

2024

2027

3 000

46.

Creation of a biochemical cluster and production of advanced chemical materials

Chemical, AIC

defined

2 500

2022

2024

defined

47.

Urea production

Chemical

Zhambyl region

600

2023

2025

320

48.

Construction of a coal chemical complex

Chemical

Karaganda region

2 600

2023

2025

1 500

49.

Construction of a modern complex meat processing plant

AIC

Almaty region

26

2018

2023

321

50.

Production of complex alloys

MMC

Karaganda region

260

2022

2023

1200

51.

Modern complex for processing of agricultural crops

AIC

Kostanay region

250

2022

2023

500

52.

Construction of logistics terminal at Altynkol station

Logistics

Almaty region

50

2022

2023

100